KS Kamnica
KAMNIŠKA GRABA

1,230 meters of new sewerage

Sewerage will be laid in the municipal road from the residential building Kamniška graba 62 to the north. The planned canal will drain only domestic municipal wastewater and will be connected to the existing sewer. Municipal wastewater will be properly treated at the Maribor Central Wastewater Treatment Plant.

Kamniška graba

Expected start of works:
28. february 2022
Expected completion of works:
1. june 2022

KS Malečnik - Ruperče
MALEČNIK–TRČOVA

9,600 meters of gravity and pressure channel and nine pumping stations

In the area of Malečnik, we will build a sewerage system for the drainage of municipal water, which will be connected to the existing and also to the newly built sewerage network. The canals, which will be implemented in the regional and local roads, will discharge only sanitary wastewater in the direction of the existing sewerage network and further towards the Maribor Central Wastewater Treatment Plant. It is planned to cross a stream with pumping and pressure pipes suspended on a nearby bridge structure. There will be one pumping station in the Malečnik area.

In the area of Trčova, we will implement a sewerage system for the drainage of municipal wastewater, which will be connected to the existing and newly built sewerage network. The canals, which will be implemented in the regional and local roads, will discharge only sanitary wastewater in the direction of the existing sewerage network and further towards the Maribor Central Wastewater Treatment Plant. Eight standard pumping stations are planned.

Malečnik

Expected start of works:
14. august 2022
Expected completion of works:
11. august 2023

KS Pekre
PEKRE–HRASTJE

6,800 meters of gravity and pressure channel and a discharge tank with a pumping station

The sewerage system will be based on routes that allow the connection of all secondary connections and as many facilities as possible. In order to separate rainwater from municipal water in the area of the mixed canal system in the settlement of Pekre, a containment and relief facility is planned in the area of the Pekre fire station.

Pekre

Expected start of works:
29. november 2021
Expected completion of works:
9. june 2023

KS Limbuš
LIMBUŠ–LAZNICA

1,230 meters of new sewerage

Sewerage will be laid in the municipal road from the residential building Kamniška graba 62 to the north. The planned canal will drain only domestic municipal wastewater and will be connected to the existing sewer. Municipal wastewater will be properly treated at the Maribor Central Wastewater Treatment Plant.

Kamnica

Expected start of works:
28. february 2022
Expected completion of works:
1. june 2022